PHOTO GALLERY

Pulling rigs out of winter storage in Rampart for second year of drilling.

Drilling residential wells in Village of Rampart for ANTHC ( Alaska Native Tribal Health Consortium)

Dutch Harbor

Drilling residential wells in Village of Rampart for ANTHC ( Alaska Native Tribal Health Consortium)

Drilling residential wells in Village of Rampart for ANTHC ( Alaska Native Tribal Health Consortium)

Drilling in Rampart.

Drilling in Rampart.

Drilling in Rampart.

Well pump change out for City of Wasilla. 1200 gallon per minute GPM pump.

Large track rig drilling on air strip. Wasilla.

Drilling in Rampart.

Water wells for maintenance facilities at airport in Cordova Ak. Ferry ride from Whittier to get there.

Flying air compressor off remote sight

Drilling in Rampart.

Drilling in Rampart.

Drilling in Rampart.

Pulling rigs out of winter storage in Rampart for second year of drilling.

Drilling in Rampart.

Welding on the next joint of pipe. With smaller rigs pipe lengths must be 10’ which makes the job take longer.

Drilling in Rampart.

Drilling in Rampart.

Rig maintenance in yard

Dutch Harbor

Drilling in Rampart.